通风管道系统是为空气循环和减少有害物质而建立的设施。通风管道风管的制造和安装所用的板材和其他材料应符合设计和现行标准。那么通风管道加工使用会展开加固工作是怎样的呢?
Ventilation duct system is a facility established for air circulation and reduction of harmful substances. The plates and other materials used for the manufacture and installation of ventilation ducts shall comply with the design and current standards. So what is the reinforcement work for the processing and use of ventilation pipes?
通风管道排出废气
Exhaust gas from ventilation duct
餐厅和酒店的厨房会产生大量的油烟,需要排放。通风管道是主要的排污设备。
Restaurants and hotel kitchens will produce a large amount of oil smoke, which needs to be discharged. Ventilation duct is the main sewage discharge equipment.
通风管道送冷风
Cold air supplied by ventilation duct
通常使用空调管道,这些管道需要隔热。螺旋风管内可粘贴保温材料,外表美观。
Air conditioning ducts are usually used, which need to be insulated. The spiral air duct can be pasted with thermal insulation materials, which has a beautiful appearance.
通风管道除尘
Ventilation duct dedusting
在一些工厂、生产车间有大量的灰尘,需要特殊的除尘设备。螺旋风管可用于大风量管道流量。
There is a lot of dust in some factories and production workshops, so special dust removal equipment is required. Spiral duct can be used for large air volume pipe flow.
实际使用情况等方面展开加固工作。此外,还可以采用防下垂加固法,这种方法主要是对特殊管材进行展开加固,其中主要包括迂回管材、经变管材等,以避免
济南通风管道加工在实际使用中发生位移和下垂。
The reinforcement work shall be carried out in terms of actual service conditions. In addition, anti sagging reinforcement method can also be adopted. This method is mainly used to strengthen special pipes, including circuitous pipes and changed pipes, so as to avoid displacement and sagging during actual use of Jinan ventilation pipe processing.
当风管与风机连接时,应在进出风口处加软接头,其软接头的断面尺寸应与风机进出风口一致,软管接头一般可采用帆布、人造革等材料,软管长度不宜小于200,松紧度应适宜,柔性软管可缓冲风机的振动。当风道与除尘设备、加热设备等连接前,应待设备安装完毕后,按实际测绘的图纸进行预制和安装。
When the air duct is connected with the fan, a soft joint shall be added at the air inlet and outlet. The cross-section size of the soft joint shall be consistent with the air inlet and outlet of the fan. The hose joint can generally be made of canvas, artificial leather and other materials. The length of the hose shall not be less than 200, and the tightness shall be appropriate. The flexible hose can buffer the vibration of the fan. Before connecting the air duct with the dust removal equipment and heating equipment, the prefabrication and installation shall be carried out according to the actual mapping drawings after the equipment installation.
That's all for the reinforcement work in the ventilation duct processing and use meeting. You can follow our website www.jnqsg Com learn more!