顾名思义,“管道”是一种输送空气的管道,所以当空气流出或进入设备时,它就被使用。在安装管道的时候还有一些事情需要注意,所以让我来告诉你。
As the name implies, "pipeline" is a kind of pipeline for conveying air, so when air flows out or enters the equipment, it is used. There are other things that need attention when installing pipes, so let me tell you.
1. 施工区域的布线和施工设备的布线应由现场电工操作人员进行。不要随意捡起和拉起。
1. The wiring of the construction area and the wiring of the construction equipment shall be carried out by the field electrical operators. Don't pick it up and pull it up at will.
2. 各种机器应严格按照操作规程操作。
2. All kinds of machines should be operated in strict accordance with the operating rules.
3、在风管运输和安装过程中一定要注意保护成品,防止对镀锌表面造成损坏。
3. Attention must be paid to the protection of finished products during the transportation and installation of ducts to prevent damage to galvanized surfaces.
4. 操作切割机时,必须有合格人员的保护和操作。
4. When operating the cutting machine, it must be protected and operated by qualified personnel.
有许多民用建筑管道。严禁施工、休息、通行。
There are many civil building pipes. Construction, rest and passage are strictly prohibited.
6. 严禁无证作业,严禁酒后操作,严禁生病。
6. No undocumented work, no drunk operation and no illness.
7. 配电箱在施工过程中应配置并定期检查。
7. Distribution boxes should be safely allocated and regularly inspected during construction.
8. 负责人应在上课前做演讲,并有针对性。
8. The person in charge should give a safety speech before class, and be targeted.
9. 然后转到特定的操作员那里。
9. Then go to a specific operator.
10. 未完成项目严格按照《施工操作规范》和指导方针执行,严格按照项目部施工单位的进场要求执行。
10. Unfinished projects shall be implemented strictly in accordance with the Code for Safe Operation of Construction and the guidelines, and strictly in accordance with the requirements of the construction units of the Project Department.
重庆风管、重庆风管加工、重庆风管安装、重庆风管工程、重庆风管设计、重庆风管处理、重庆风管安装、重庆风管设计
Chongqing duct, Chongqing duct processing, Chongqing duct installation, Chongqing duct engineering, Chongqing duct design, Chongqing duct treatment, Chongqing duct installation, Chongqing duct design
安装前应先绘制设计图纸,然后按图纸要求进行安装:
Before installation, design drawings should be drawn and then installed according to the requirements of drawings.
1. 为了在清洁的环境中工作,安装前应周围的灰尘,并保持与手接触的部件的清洁;
1. In order to work in a clean environment, dust should be removed before installation and the parts in contact with hands should be kept clean.
2. 然后根据管道类型将其放置在清洁的环境中;
2. Place it in a clean environment according to the type of pipe.
3.按照图纸上的安装系统编号顺序悬挂风管。安装每个系统时,从部分开始。各系统的拉链头在6点钟方向;
3. Hang up the air duct according to the installation system number on the drawings. When installing each system, start with the first part. The zipper heads of each system are in the direction of 6 o'clock.
4. 根据风管上的标签从小到大悬挂。
4. Hang from small to large according to the label on the duct.
5. 每个系统挂好后,风管变平,后一个挂钩用锁固定,没有任何褶皱。
5. After each system is hooked up, the air duct becomes flat, and the last hook is fixed with a lock without any wrinkles.
上一篇:济南厨房排烟罩的设计要考虑哪些因素?
下一篇:厨房排烟罩设计有什么不合理的地方?